The guys have been hard at work on the inside, too, building the landing for our stairs. Bricks have pushed me to the edge of excitement; next week, stairs might put me in a coma.
Friday, June 6, 2008
And more bricks
Thursday, June 5, 2008
Wednesday, June 4, 2008
Have a seat
Tuesday, June 3, 2008
One brick at a time
Two bricks made their way onto our front wall today. They're not attached yet, but will be soon. The concrete mixer is now on-site to mix the mortar, and the bricks are ready to go.
The house is becoming a hive of activity these days. Our meter has been installed, and the electrician is starting tomorrow. If everything goes as planned, we should have hydro running to the house by the end of this week. This is great news for our builder, who can then stop renting the generator for the crew's tools, and it's better for the environment, which isn't crazy about emissions from generators. Our mechanical system will be installed this week too, in preparation for our concrete floors next week. Once the electrical is in, the floor is insulated and the piping for the radiant heating is laid, the yogurt-like DaroTopp light-weight concrete floor will be poured.
Monday, June 2, 2008
Sista on tha ladda
First stairs
We spent a lot of time shopping over the weekend. We looked for bendable, rectangular trim, a product we've decided is purely mythical. We also looked for a replacement sink and tub/shower unit for our first-floor bathroom, since the ones our gracious friends in Kingston gave us won't fit with the curved wall and piping, respectively. (We will still find a home for them in the basement apartment, but we were really hoping to use them ourselves.) We also checked out some couches at a couple of stores and think we might have found the one we've been looking for. It's a very nice sectional with a sofa bed. We were worried it would be too big for the living room, but we measured the space and it looks like it might work out. We're planning on visiting at least one more store before we decide.
Finally, we bought our interior doors yesterday. They are all clear pine doors with five rectangular "lights" (glass panes) of translucent glass. They will be stained to coordinate with the other woods in the house. We expect to receive them in about four to six weeks.