Sunday, August 31, 2008
Brick-a-brac
Friday, August 29, 2008
Treads preview
Thursday, August 28, 2008
Stairs to the basement!
The interior and exterior stairs to the basement were installed today, and they look great. The interior stairs, in the left photo, lead to the ever-decreasing jam storage area (surely they must be finished pushing out my condiments with mechanical equipment by now). The exterior stairs, in the right photo, lead to the bachelor apartment we hope to rent out sometime in the winter.
Wednesday, August 27, 2008
Amateur hour
Phase 1 of our tiling adventure has taught us a few things:
1) Tiling is 20 per cent tile setting, 80 per cent cleaning. I have mortar in places you don't want to imagine.
2) It is extremely time-consuming to clean dried cement off of tiles. We will not allow mortar to dry on tiles in phase 2 of our tiling odyssey.
3) Our marriage will probably survive finishing our bathroom.
Our first three and a half rows turned out pretty well. The tiles actually look like bricks, which was the goal. The next row is a decorative listel, which has a few different colours in it. This listel border will wrap around the tub and shower. We're aiming to put in the listel and finish the rest of the rear wall tomorrow.
Tile on!
Tuesday, August 26, 2008
Party in the back
As the exterior design comes to life, you can see why we call our place the Mullet House. The front is very traditional, while the back is more modern. Business in the front, party in the back!
Taping and mudding
Subscribe to:
Posts (Atom)