Saturday, January 12, 2008

The adventure begins

On January 9, 2008, the little infill lot at 94A Crichton Street became a construction site! After six intense months of designing and decision making, we finally got our building permit, signed on the dotted line with our builder and bank, and got this show on the road. We are very excited, and look forward to sharing our experience with you every step of the way. Enjoy!

1 comment:

papa/dad said...

I must say *Educational and Humourous* Absolutely thrilled that things are moving on schedule. I sincerely hope you do not encounter (Pop-Ups). I'm anxious to keep up with the progress report. Things are looking up.
papa/dad